Terms Of Use Privacy Statement

MEW takes proactive steps to avert summer power failure

Latest News Kuwait City 11 Apr 24
MEW takes proactive steps to avert summer power failure
MEW takes proactive measures to avert summer power failure
Fee
Event Location
Kuwait, Kuwait
Area
Kuwait City
Start Time
11 April 2024, 12:00 AM
End Time
31 May 2024, 12:00 AM
Website

The Ministry of Electricity, Water, and Renewable Energy disclosed that from January 1 to August 30, 2023, there were 1,071 power outages that the Ministry swiftly managed until peak loads subsided.

Restoring power to affected areas undergoes a rapid process, prioritizing time efficiency. The Ministry is devising a comprehensive plan comprising 10 main strategies to prevent recurrence of such outages, reports Al-Jarida citing Ministry informed sources.

After receiving outage complaints through the unified call center 152, the Ministry swiftly dispatches them to emergency centers across governorates. Technical teams, working round the clock, coordinate with contractor teams to restore power promptly.

Temporary backup diesel generators are deployed if necessary until faults are rectified. Identifying outage causes, whether natural disruptions or network infringements, prompts tailored responses. Natural outages, stemming from weather elements or cable issues, are swiftly addressed, with replacements or reinforcements made to strengthen the medium and low voltage networks.

Excessive loads are redistributed, and networks fortified to mitigate future overload risks. Aging equipment prone to frequent malfunctions is being replaced with advanced counterparts. In cases of tampering or network trespassing, judicial police intervention is sought, while technical reports guide preventive measures to forestall future occurrences.

Kuwait MEW news



Popular Events

Related Events